Safety Considerations And Symbol Descriptions
3
Regarding This Manual
3
Explanation Of Symbols
3
Observe The Following Symbols
3
Installation Guidelines
4
Boiler Room Guidelines
4
Tools, Materials And Accessories
4
Disposal
4
Product Description
5
Intended Use
5
Certification And Testing Mark
5
Notes On Installation And Operation
5
Heating System Water Quality
5
Product Description
6
Pack Contents
7
Dimensions Specifications
8
Logano G115 Ws Dimensions
8
Conditions For Operation
9
General Operating Conditions
9
Conditions For The Boiler Room And The Environment
10
Combustion Air Supply Conditions
10
Conditions, Fuel
10
Conditions Power Supply
11
Conditions For Hydraulic System And Water Quality
11
Moving The Boiler
12
Reducing Boiler Weight For Transportation Purposes
12
Lifting And Carrying The Boiler
13
Using Transportation Aids To Transport The Boiler
13
Installing The Boiler
14
Wall Clearances
14
Reversing Boiler Door
15
Mounting The Adjustable Feet (Included With B-Kit)
16
Positioning And Leveling The Boiler
16
Installing The Boiler
17
Flue Pipe Installation
17
Chimney Venting
17
Fitting The Water Connections
19
Fitting The B-Kit
19
Installation Of Boiler Drain (Included In B-Kit)
20
Installing System Components
20
Filling The Heating System And Checking For Leaks
21
Mounting The Burner
23
Connecting The Fuel Supply
23
Aquasmart Installation
24
Blocked Vent Switch (Required In Canada)
24
Electrical Connections
24
Fitting The Controls
25
Fitting Temperature Sensor Assembly And Burner Cable
26
Connecting The Power Supply And Additional Components
27
Fitting Cable Ties
27
Fitting Outer Casing Panels
27
Commissioning The Heating System
28
Bringing The System Up To Operating Pressure
28
Checking The Safety Valve
28
Checking Position Of Heat Exchanger Baffles
29
Preparing The Heating System For Operation
29
Starting Up The Control And The Burner
29
Notes On Commissioning The Burner
30
Raising Flue Gas Temperature
30
Adjusting The Position Of Heat Exchanger Baffles
31
Removing Heat Exchanger Baffles
31
Removing The Heat Exchanger Barrier Plate
32
Manual Reset High Limit (Stb)
32
Installing The Burner Door Jacket
32
Commissioning Log
33
Shutting Down The Heating System
34
Shutting Down Normally
34
Shutting Down The Heating System In An Emergency
34
What To Do In An Emergency
34
Heating System Servicing
35
Why Is Regular Maintenance Important?
35
Preparing The Boiler For Servicing
35
Cleaning The Boiler
36
Cleaning The Boiler With Brushes
36
Wet Cleaning (Chemical Cleaning)
37
Checking Heating System Operating Pressure
37
Testing Relief Valve
38
Servicing And Maintenance Logs
39
Troubleshooting
42
Installation Examples
43
Parts Lists
45
Circuit Diagrams
50
Index
56
Diskussion
Hinterlassen Sie einen Kommentar oder stellen Sie eine Frage
An der Diskussion teilnehmen
Stellen Sie eine Frage zum Handbuch oder fügen Sie eine hilfreiche Antwort für andere Nutzer hinzu.