1 Safety
1
1.1 Unpacking And Inspection
1
1.2 Installation Safety
1
1.3 Electrical Connection Safety
2
1.4 Operation Safety
4
1.5 Maintenance Safety
4
1.6 Disposal Safety
5
2 Product Description
6
2.1 System Introduction
6
2.2 Product Introduction
6
2.3 Symbols On The Product
8
2.4 Led Indicator
9
2.5 Dc Switch
9
2.6 Pv Energy Storage System (Pv Ess)
10
2.6.1 Pv Ess Introduction
10
2.6.2 Declaration For Back-Up Function
11
2.6.3 Energy Management
11
2.7 Parallel System
13
2.7.1 Grid-Connected Parallel System
13
2.7.2 Off-Gridparallel System
15
2.8 Retrofitting The Existing Pv System
18
3 Function Description
21
3.1 Safety Function
21
3.1.1 Protection
21
3.1.2 Earth Fault Alarm
21
3.2 Energy Conversion And Management
21
3.2.1 Power Derating
21
3.2.2 Drm (“Au”/“Nz”)
22
3.2.3 Regular Operational Voltage Range
22
3.2.4 Regular Operational Frequency Range
23
3.2.5 Reactive Power Regulation
23
3.2.6 Load Control
23
3.3 Battery Management
23
3.3.1 Charge Management
25
3.3.2 Discharge Management
26
3.4 Communication And Configuration
27
4 Unpacking And Storage
28
4.1 Unpacking And Inspection
28
4.2 Scope Of Delivery
29
4.3 Inverter Storage
30
5 Mechanical Mounting
31
5.1 Safety During Mounting
31
5.2 Location Requirements
31
5.2.1 Environment Requirements
32
5.2.2 Carrier Requirements
32
5.2.3 Angle Requirements
33
5.2.4 Clearance Requirements
33
5.3 Installation Tools
33
5.4 Moving The Inverter
35
5.5 Installing The Inverter
35
6 Electrical Connection
38
6.1 Safety Instructions
38
6.2 Terminal Description
39
6.3 Electrical Connection Overview
41
6.4 External Grounding Connection
44
6.4.1 External Grounding Requirements
45
6.4.2 Connection Procedure
45
6.5 Ac Cable Connection
46
6.5.1 Ac Side Requirements
46
6.5.2 Assembling The Ac Connector
47
6.5.3 Installing The Ac Connector
49
6.6 Dc Cable Connection
51
6.6.1 Pv Input Configuration
52
6.6.2 Assembling The Pv Connectors
53
6.6.3 Installing The Pv Connector
54
6.7 Communication Connection
55
6.7.1 Ethernet Connection
55
6.7.2 Winet-S Connection
58
6.7.3 Rs485 Connection
61
6.8 Smart Energy Meter Connection
64
6.9 Battery Connection
64
6.9.1 Connecting The Power Cable
65
6.9.2 Connecting The Can Cable
67
6.9.3 Connecting The Enable Cable
67
6.10 Do Connection
68
6.11 Di Connection
69
6.11.1 Assembling The Com Connector
70
6.11.2 Installing The Com Connector
72
6.12 Backup Connection
72
7 Commissioning
74
7.1 Inspection Before Commissioning
74
7.2 Commissioning Procedure
74
7.3 Apppreparation
75
7.4 Creatinga Plant
75
7.5 Initializingthe Device
78
7.6 Configuringthe Plant
80
8 Isolarcloud App
85
8.1 Brief Introduction
85
8.2 Installingthe App
85
8.3 Account Registration
86
8.4 Login
87
8.4.1 Requirements
87
8.4.2 Loginprocedure
87
8.5 Initial Settings
89
8.5.1 Feed-Inlimitation
89
8.5.2 Backupmode
90
8.5.3 Reactivepower Regulation Mode
90
8.6 Functionoverview
93
8.7 Home
93
8.8 Runinformation
94
8.9 Records
95
8.9.1 Chart
95
Diskussion
Hinterlassen Sie einen Kommentar oder stellen Sie eine Frage
An der Diskussion teilnehmen
Stellen Sie eine Frage zum Handbuch oder fügen Sie eine hilfreiche Antwort für andere Nutzer hinzu.