Netra™ T 1400/1405 Installation And User’s Guide
1
Contents
3
1. Product Overview1
3
2. Installing The System5
3
3. Installing The Electrical Supply11
3
4. External I/O Connections27
4
5. Installing The Alarms Software39
4
6. Replacing The Air Filter43
4
7. Leds And Controls47
4
8. System Start-Up And Operation55
5
9. Open Boot Prom57
5
10. Using Lomlite61
5
11. System Shut-Down67
5
Figures
7
How This Book Is Organized
11
Typographic Conventions
12
TableP1 Typographic Conventions
12
Shell Prompts
12
TableP2 Shell Prompts
12
Related Documentation
13
TableP3 Related Documentation
13
Sun Welcomes Your Comments
13
I Installation
15
1
17
Product Overview
17
System Unit Features
17
Figure11 NetraT1400 System Unit Front View
19
Figure12 NetraT1400 System Unit Rear View
19
Figure13 NetraT1405 System Unit Front View
20
Figure14 NetraT1405 System Unit Rear View
20
2
21
Installing The System
21
Environmental Considerations
21
Dimensions
21
Forced Air Cooling Requirements
22
1. Adequate Airflow Through The Host Equipment Frame Must Be Ensured.
22
2. The Air Is Drawn Through The Front Of The NetraT1400/1405 Enclosure And Expelled From The Re...
22
3. The Inlet And Exhaust Ventilation Areas Must Be A Minimum Of 200 Sq Cm Each.
22
Figure21 NetraT1400/1405 Airflow
22
4. To Maintain Adequate Airflow We Strongly Recommend That You Inspect And, If Necessary, Replace...
22
5. If The NetraT1400/1405 Computer System Is Fully Enclosed By Its Host Equipment Rack, The Hos...
22
Mechanical Considerations
23
Removing The Sacrificial Shipping Plates
23
Figure22 Sacrificial Shipping Plates
23
Figure23 NetraT1400/1405 Flange Options And Dimensions
24
Table21 Optional Mounting Flange Kits
25
Figure24 Flange Mount Assembly
26
3
27
Installing The Electrical Supply
27
System Switch
27
1400
27
Connectors
28
1400
28
1405
28
Dc Source Site Requirements
28
Table 31 Dc Power Requirements
28
Overcurrent Protection Requirements
29
Grounding
29
Dc Supply And Ground Conductor
29
Power And Grounding Connections
30
Figure31 Dc Input Connector
30
Figure32 Strain Relief Housings
30
Figure33 Cage Clamp Operating Lever
31
Figure34 Power Connector On The Dc Power Supply
31
To Wire The Dc Input Power Connector
32
1. Turn Off Power To The Dc Power Source By Opening The Circuit Breakers.
32
2. Strip 8Mm (0.31 Inches) Of Insulation From Each Of The Wires To Be Fitted To The Connector.
32
Figure35 Stripping The Insulation From The Wire
32
3. Using A Dc Connector From The Kit, Insert The Tip Of A Cage Clamp Operating Lever Into The Rec...
32
Figure36 Opening The Dc Connector Cage Clamp Using The Cage Clamp Operating Lever
33
4. Feed The Stripped End Of Each Wire Into The Appropriate Hole In The Dc Input Connector.
34
Figure37 Assembling The Dc Input Power Cable
34
5. Repeat Step3 And Step4 For The Other Two Wires To Complete The Assembly Of The Dc Input Powe...
34
6. If You Are Not Using The Optional Strain Relief Housing, Secure The Wires Together With A Wire...
34
7. Repeat Step2 Through Step6 To Wire The Other Five Dc Input Power Connectors.
34
To Install The Optional Strain Relief Housings
34
1. Take The Dc Input Connector And Insert The Bottom Portion Of The Strain Relief Housing Into Th...
34
Figure38 Inserting The Bottom Portion Of The Strain Relief Housing
35
2. Route The Three Wires Coming From The Dc Power Source Through The Opening At The End Of The Bo...
35
Figure39 Routing The Wires Out Of The Bottom Portion Of The Strain Relief Housing
35
3. Insert The Wire Tie Into The Bottom Portion Of The Strain Relief Housing.
35
Figure310 Securing The Wires To The Strain Relief Housing
36
4. Loop The Wire Tie Over The Wires And Back Out Of The Strain Relief Housing, Then Tighten The W...
36
5. Lower The Three Prongs On The Top Portion Of The Strain Relief Housing Into The Openings In Th...
36
Figure311 Assembling The Strain Relief Housing
37
Figure312 Connecting The Dc Power Cable To The Netra Dc Power Supply
38
Ac Source Site Requirements
39
1405
39
Chassis Enclosure Grounding
39
To Power On The System
40
1. Prior To Powering On, Inspect The Supply Conductors For Correct Polarity And Mechanical Security.
40
2. Activate The External Circuit Breaker(S).
40
3. Set The Front Panel On/Stby System Switch To The On Position And Hold It Until The System Star...
40
Figure313 System Power-On (Front Panel)
40
To Power Off The System
41
1. Where Necessary, Notify The Users That The System Is Going Down.
41
2. Back Up System Files And Data.
41
3. Halt The Operating System.
41
4. Continue With Step A. Or B., As Appropriate.
41
A. Set The On/Stby Switch At The Front Of The System Cabinet To The Stby Position And Release It ...
41
B. Set The On/Stby Switch At The Front Of The System Cabinet To The Stby Position And Hold It For...
41
5. Verify That The System Led Is Off.
41
6. Disconnect The Ac Or Dc Power Connector(S) From The Rear Of The System, Or Open The External C...
41
7. Verify That The Power Led Is Off.
41
Figure314 System Power-Off (Front Panel)
42
4
43
External I/O Connections
43
Connector Layout
43
Figure41 Back Panel Connectors
44
Parallel Interface
45
Figure42 Db-25 Parallel Connector
45
Table41 Parallel Connector Pinout
45
Serial Connectors
46
Figure43 Db-25 Serial Connectors
46
Table42 Serial Connector Pinout, Rs423/Rs232
46
Twisted-Pair Ethernet (Tpe) Connector
47
Figure44 Rj45 Tpe Socket
47
Table43 Tpe Connector Pinout
47
Tpe Cable-Type Connectivity
47
Table44 Tpe Stp-5 Cable Lengths
48
Scsi Connector
48
Figure45 68-Pin Scsi Connector
48
Table45 68-Pin Scsi Connector Pinout
48
Scsi Implementation
49
Scsi Cabling And Configuration
50
Scsi Cabling Procedure
50
1. Count The Number Of Scsi Devices On The System Scsi Bus. Be Sure To Count The Host Adapter As ...
50
2. Determine The Total Scsi Bus Length.
50
Table46 Determining Scsi Bus Length
50
3. Verify The Cable Type Used To Connect External Scsi Devices. You Must Use Fast-20 Scsi Cable(S).
51
Scsi-2 (Fast Wide Scsi) External Devices
51
Figure46 Connecting External Mass Storage Devices
51
Alarms Ports
52
Figure47 Db-15 (Male) Alarms Service Port Connector
52
Table47 Alarms Service Port Connector Pinout
52
Figure48 Rj45 Lights Out Management Serial Connector
53
Table48 Lights Out Management Serial Connector Pinout
53
5
55
Installing The Alarms Software
55
Installation Procedure
55
1. Log On As Root.
55
2. Insert The Lights Out Management Release Cd-Rom In The Drive.
55
3. Add The Packages To The System:
55
4. Verify That The Packages Have Been Installed Successfully.
55
Network Installation Procedure
56
Installation Procedure
56
1. Log On To The Server As Root.
56
2. Insert The Lights Out Management Release Cd-Rom In The Drive.
56
3. Create A Directory In /Export.
56
4. Copy The Contents Of The Lights Out Management Cd-Rom Into The New Directory.
56
5. On The Client, Mount The Lom_Software Directory On A Suitable Directory:
56
6. Add The Packages To The System:
56
7. Verify That The Packages Have Been Installed Successfully:
56
Sunvts Software
57
Installation Procedure
57
1. Install The Sunvts Software According To The Instructions Given In The Appropriate Sunvts User...
57
2. Log On As Root.
57
3. Insert The Lights Out Management Cd-Rom In The Drive.
57
4. Add The Packages To The System:
57
5. If 64-Bit Support Is Required Add The Additional Packages:
57
6. Verify That The Packages Have Been Installed Successfully:
57
6
59
Replacing The Air Filter
59
To Replace The Air Filter
59
1. Remove The Upper (Fan) Front Cover Of The NetraT1400/1405 System By Turning The Two Quarter-...
59
Figure61 Replacing The Air Filter
59
2. Remove The Existing Air Filter And Replace It With The New Filter (Part Number X7075A). Ensure...
60
3. Replace The Upper Front Cover Of The System And Secure It In Place By Turning The Two Catches ...
60
Ii User Guide
61
7
63
Leds And Controls
63
Leds
63
Figure71 NetraT1400 System Leds
64
Table71 NetraT1400 System Led Functions
64
Figure72 NetraT1405 System Leds
65
Table72 NetraT1405 System Led Functions
65
System On/Stby Switch
66
To Power On The System
66
1. Prior To Powering On, Inspect The Supply Conductors For Correct Polarity And Mechanical Security.
66
2. Activate The External Circuit Breaker(S), Or Plug It Into The Mains Supply.
66
3. Set The Front Panel On/Stby System Switch To The On Position And Hold It Until The System Star...
66
Figure73 System Power-On (Front Panel)
66
To Power Off The System
67
1. Where Necessary, Notify The Users That The System Is Going Down.
67
2. Back Up System Files And Data.
67
3. Halt The Operating System.
67
4. Continue With Step A. Or B., As Appropriate.
67
A. Set The On/Stby Switch At The Front Of The System Cabinet To The Stby Position And Release It ...
67
B. Set The On/Stby Switch At The Front Of The System Cabinet To The Stby Position And Hold It For...
67
5. Verify That The System Led Is Off.
67
6. Disconnect The Ac Or Dc Power Connector(S) From The Rear Of The System, Or Open The External C...
67
7. Verify That The Power Led Is Off.
67
Figure74 System Power-Off (Front Panel)
68
1400
69
1405
69
8
71
System Start-Up And Operation
71
Open Boot Prom
73
Nvram Configuration Parameters
73
Table91 Nvram Configuration Parameters
73
Emergency Procedures
75
Running Diagnostics
75
New Devices In The Obp Device Tree
76
10
77
Using Lomlite
77
Lomlite Functionality
77
Diagnosing Psu Faults
78
Diagnosing Fan Faults
78
Power
79
Serial Connection
79
Table101 Lomlite Commands
80
Configuring Lomlite
81
Table102 Lomlite Configuration File Parameters
81
Fault Led
81
System Watchdog
82
System Monitoring
82
11
83
Table111 Commands For Shutting Down The System
83
Index
85
A
85
B
85
C
85
D
85
E
85
F
85
G
86
H
86
I
86
L
86
M
86
N
86
O
86
P
86
S
86
T
87
Diskussion
Hinterlassen Sie einen Kommentar oder stellen Sie eine Frage
An der Diskussion teilnehmen
Stellen Sie eine Frage zum Handbuch oder fügen Sie eine hilfreiche Antwort für andere Nutzer hinzu.